MCQOPTIONS
Saved Bookmarks
| 1. |
At the construction stage, binding wires ____________ |
| A. | Should touch the formwork |
| B. | Should not touch the formwork |
| C. | To be turned outside |
| D. | To be turned whole structure |
| Answer» C. To be turned outside | |