

MCQOPTIONS
Saved Bookmarks
1. |
At the construction stage, binding wires ____________ |
A. | Should touch the formwork |
B. | Should not touch the formwork |
C. | To be turned outside |
D. | To be turned whole structure |
Answer» C. To be turned outside | |