

MCQOPTIONS
Saved Bookmarks
1. |
After fixing the plane table to the tripod, the main operations which are needed at each plane table station are(i) Levelling(ii) Orientation(iii) CenteringThe correct sequence of these operations is |
A. | (i), (ii), (iii) |
B. | (i), (iii), (ii) |
C. | (iii), (i), (ii) |
D. | (ii), (iii), (i) |
Answer» C. (iii), (i), (ii) | |