MCQOPTIONS
Saved Bookmarks
| 1. |
After finishing concrete surface must be kept ___________ |
| A. | Dry |
| B. | First dry it and then wet it |
| C. | First wet it and then dry it |
| D. | Wet |
| Answer» E. | |