| 1. |
A transmission and distribution engineer needed to design the sub transmission substation. The tapping component needed will be _______________ |
| A. | feeder |
| B. | distributor |
| C. | transmitter |
| D. | tap-changing transformer |
| Answer» B. distributor | |