A takes three times as long as B and C together to do a job. B takes four times as long as A and C together to do the same work, If all three, working together can complete the job in 24 days, then the number of days, A alone will take to finish the job is: |
| A. | 100 |
| B. | 96 |
| C. | 95 |
| D. | 90 |
| E. | None of these |
| Answer» C. 95 | |