

MCQOPTIONS
Saved Bookmarks
1. |
A road bridge is proposed to be constructed across an alluvial stream with the estimated design discharge as 2500 m3/s. It is decided to adopt a total effective waterway equal to 300 m for this bridge as against the regime width of 237.5 m due to afflux considerations. If the HFL at the site is at RL 214 m, then the RL of the open foundation can be suggested as _______ |
A. | 206.6 m |
B. | 208.5 m |
C. | 207.2 m |
D. | 210.2 m |
Answer» B. 208.5 m | |