MCQOPTIONS
Saved Bookmarks
| 1. |
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved. |
| A. | 26, 000 m³ |
| B. | 26, 500 m³ |
| C. | 27, 000 m³ |
| D. | 27, 500 m³ |
| Answer» E. | |