MCQOPTIONS
Saved Bookmarks
1. |
A hydel power project has been envisaged to serve the water supply and irrigation needs of the area at its inception stage. The dam reservoir so constructed is known as __________________ |
A. | multipurpose reservoir |
B. | single-purpose reservoir |
C. | distribution reservoir |
D. | retarding reservoir |
Answer» B. single-purpose reservoir | |