A hydel power project has been envisaged to serve the water supply and irrigation needs of the area at its inception stage. The dam reservoir so constructed is known as __________________

A. multipurpose reservoir
B. single-purpose reservoir
C. distribution reservoir
D. retarding reservoir
Answer» B. single-purpose reservoir