1.

A generating station has a maximum demand of 50 MW, a load factor of 60%, a plant capacity factor of 45% and if the plant while running as per schedule, were fully loaded. The daily energy produced will be ________ MW

A. 7.20 M W.
B. 72.0 M W.
C. 0.720 M W.
D. 720 M W.
Answer» E.


Discussion

No Comment Found

Related MCQs