A generating station has a maximum demand of 50 MW, a load factor of 60%, a plant capacity factor of 45% and if the plant while running as per schedule, were fully loaded. The daily energy produced will be ________ MW |
A. | 7.20 M W. |
B. | 72.0 M W. |
C. | 0.720 M W. |
D. | 720 M W. |
Answer» E. | |