A generating station has a maximum demand of 20 mW, load factor of 60%, a plant capacity factor of 50% and a plant use factor of 72%. What is the reserve capacity of the plant, if the plant, while running as per schedule, were fully loaded? |
A. | 10 MW |
B. | 15 MW |
C. | 2 MW |
D. | 5 MW |
Answer» E. | |