

MCQOPTIONS
Saved Bookmarks
1. |
A forest land is to be surveyed without accumulating errors; the approach to be taken should be |
A. | Establish minor control points with low precision first |
B. | Locate the details first and then the major control points |
C. | Fix major control points with great precision and do detailing |
D. | Locate the animals and mark these as control points |
E. | Fix the minor control points and then start detailing |
Answer» D. Locate the animals and mark these as control points | |