MCQOPTIONS
Saved Bookmarks
| 1. |
A factory is producing 100 bolts and nuts per hour on a machine. Its material cost is Rs. 375, labour cost is Rs. 245 and the direct expense is Rs. 80. The factory on cost is 150% of the total labour cost. What is the total factory cost? |
| A. | Rs. 1067.50 |
| B. | Rs. 367.50 |
| C. | Rs. 320.25 |
| D. | Rs. 1387.75. |
| Answer» B. Rs. 367.50 | |