

MCQOPTIONS
Saved Bookmarks
1. |
A canal head work in rocky stage of a river is not suitable because |
A. | more cross drainage works are required |
B. | a costly head regulator is required |
C. | more falls are necessary to dissipate the energy |
D. | all of the above |
Answer» E. | |