MCQOPTIONS
Saved Bookmarks
| 1. |
A can do a piece of work in 28 days. If B is 40% more efficient than A B can do the same piece of work in |
| A. | 20 days |
| B. | 25 days |
| C. | 27.5 days |
| D. | 30 days |
| Answer» B. 25 days | |