A bridge culvert is to be constructed across a proposed lined canal. The afflux at this site for a contracted canal width can be computed by __________ |
A. | Unwin’s formula |
B. | Broad-crested weir formula |
C. | Orifice formula |
D. | Molesworth formula |
Answer» E. | |