MCQOPTIONS
Saved Bookmarks
| 1. |
A borrow pit soil has a dry density of 17 kN/m3. How many cubic meters of this soil will be required to construct an embankment of 100 m3 volume with a dry density of 16 kN/ m3 |
| A. | 94 m |
| B. | 106 m |
| C. | 100 m |
| D. | 90 m |
| Answer» B. 106 m | |