MCQOPTIONS
Bookmark
Saved Bookmarks
→
Aircraft Maintenance
→
Aviation Communication Systems Radar 1 in Aircraft Maintenance
→
A Boeing CH-47F Block 2 is planned to be introduce..
1.
A Boeing CH-47F Block 2 is planned to be introduced after __________
A.
2030
B.
2015
C.
2020
D.
2025
Answer» D. 2025
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The CH-47 measures 98 feet 10 inches in length.
Which of the following provides the Common Avionics Architecture System for the Boeing CH-47?
What is the service ceiling of the CH-47?
Which of the following is not an operator of the Boeing CH-47 Chinook?
CH-47C Plus was the export version of the CH-47C Chinook for the British Army.
Which of the following is similar to the MH-47E?
The Boeing CH-47 is planned to be in service beyond __________
A Boeing CH-47F Block 2 is planned to be introduced after __________
What is the full form of DAFCS?
The CH-47F can fly at speeds of over 200 mph.
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply