MCQOPTIONS
Bookmark
Saved Bookmarks
→
Engineering
→
C Programming
→
Moist curing of the exposed surfaces of concrete i...
1.
Moist curing of the exposed surfaces of concrete is done at least for
A.
3 days
B.
5 days
C.
7 days
D.
14 days
Answer» D. 14 days
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The performance of a specific task in CPM, is known
A Milestone chart
Which one of the following frequency regions is a part of sun's radiation?
Coherence of two electromagnetic waves takes place if their phase difference is :
The part radiation due to scattered/diffused radiation entering the field of view of a remote sensor other than that from the required target,
The instruments which provide electromagnetic radiation of specified wave length or a band of wave lengths to illuminate the earth surface, are called :
A dummy activity
If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity respectively, the expected time t of the activity will be
In the given figure, the network of a project represents
Final technical authority of a project lies with
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply