| 1. |
What is the objective of the volumetric well control? |
| A. | Maintain bottom hole pressure constant and allow gas to migrate to the surface |
| B. | Maintain influx pressure constant |
| C. | Maintain shoe pressure constant |
| D. | To release the packer |
| Answer» B. Maintain influx pressure constant | |
| 2. |
15 bbl/hr of partial losses are recorded and there is no tubing in the well. If personnel fails to keep the hole full for 5 hours, what is bottom hole pressure reduction after 5 hours if the casing capacity is 0.035 bbl/ft and the current mud weight is 9.2 ppg? |
| A. | 950 psi |
| B. | 1025 psi |
| C. | 1255 psi |
| D. | 550 psi |
| Answer» C. 1255 psi | |
| 3. |
The subsurface safety valve is recently tested and the result is good. Personnel can just only shut the well in using a subsurface safety valve without installing a back pressure valve and then remove the x-mas tree. |
| A. | True |
| B. | False |
| Answer» C. | |
| 4. |
Which production tree valve should not be operated in normal operations? |
| A. | Swab valve |
| B. | Upper master valve |
| C. | Lower master valve |
| D. | Wing valve |
| Answer» D. Wing valve | |
| 5. |
If gas migrates to the surface by using the volumetric method, what should be the next step? |
| A. | Bleed gas and pump mud as per calculation |
| B. | Pump mud and bleed gas as per calculation |
| C. | Bleed off the gas and flow check |
| D. | Bleed off as continuously |
| Answer» C. Bleed off the gas and flow check | |