

MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
1. |
A normal annular preventer will seal pressure on the dual string completion when closed. |
A. | True |
B. | False |
Answer» C. | |
2. |
As long as the fluid weight is more than formation pressure, you can use solid free brine to control the well which has high permeable zones. |
A. | True |
B. | False |
Answer» C. | |
3. |
Which of the following method can be used as remedial measures for plugged perforation? |
A. | Breaking the perforation with ball sealer |
B. | Use of viscous gel |
C. | Reaming |
D. | Chemical treatment |
Answer» B. Use of viscous gel | |
4. |
With gas migration in a shut-in well, which one does not increase? |
A. | Gas bubble pressure |
B. | Surface pressure |
C. | Bottom hole pressure |
D. | Shut-in drill pipe pressure |
Answer» B. Surface pressure | |
5. |
Personnel observes that the annulus pressure on a producing well increases from 0 psi to 300 psi. The well has the packer set to isolate annuls. What does this indicator tell you? |
A. | The packer is leaking |
B. | Temperature in the annulus increases. |
C. | The temperature in the annulus decreases |
D. | The packer is leaking and there is a rise in temperature in the annulus |
Answer» E. | |