Explore topic-wise MCQs in Petroleum Production Operations.

This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.

1.

A normal annular preventer will seal pressure on the dual string completion when closed.

A. True
B. False
Answer» C.
2.

As long as the fluid weight is more than formation pressure, you can use solid free brine to control the well which has high permeable zones.

A. True
B. False
Answer» C.
3.

Which of the following method can be used as remedial measures for plugged perforation?

A. Breaking the perforation with ball sealer
B. Use of viscous gel
C. Reaming
D. Chemical treatment
Answer» B. Use of viscous gel
4.

With gas migration in a shut-in well, which one does not increase?

A. Gas bubble pressure
B. Surface pressure
C. Bottom hole pressure
D. Shut-in drill pipe pressure
Answer» B. Surface pressure
5.

Personnel observes that the annulus pressure on a producing well increases from 0 psi to 300 psi. The well has the packer set to isolate annuls. What does this indicator tell you?

A. The packer is leaking
B. Temperature in the annulus increases.
C. The temperature in the annulus decreases
D. The packer is leaking and there is a rise in temperature in the annulus
Answer» E.