1. |
Which of the following is correct regarding the Kill fluid? |
A. | A very-low-density mud |
B. | Sea Water with low density |
C. | Very High-density Mud |
D. | Brine Water with low density |
Answer» D. Brine Water with low density | |
2. |
Which of the following valves is a small threaded check valve used to isolate wellbore pressure when installing on wellhead outlets? |
A. | TIW Valve |
B. | Swab Valve |
C. | SCSSV |
D. | Valve Removal Plug |
Answer» E. | |
3. |
Tubing and surface equipment condition is not the which people should consider when determining the maximum pressure while bull heading. |
A. | True |
B. | False |
Answer» C. | |
4. |
In workover operation, tripping speed is not important while pulling out of the hole the completion string because the completion brine has less viscous therefore the swabbing will not happen. |
A. | True |
B. | False |
Answer» C. | |