Explore topic-wise MCQs in Petroleum Production Operations.

This section includes 4 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.

1.

Which of the following is correct regarding the Kill fluid?

A. A very-low-density mud
B. Sea Water with low density
C. Very High-density Mud
D. Brine Water with low density
Answer» D. Brine Water with low density
2.

Which of the following valves is a small threaded check valve used to isolate wellbore pressure when installing on wellhead outlets?

A. TIW Valve
B. Swab Valve
C. SCSSV
D. Valve Removal Plug
Answer» E.
3.

Tubing and surface equipment condition is not the which people should consider when determining the maximum pressure while bull heading.

A. True
B. False
Answer» C.
4.

In workover operation, tripping speed is not important while pulling out of the hole the completion string because the completion brine has less viscous therefore the swabbing will not happen.

A. True
B. False
Answer» C.