MCQOPTIONS
Saved Bookmarks
This section includes 4 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
Which of the following is correct regarding the Kill fluid? |
| A. | A very-low-density mud |
| B. | Sea Water with low density |
| C. | Very High-density Mud |
| D. | Brine Water with low density |
| Answer» D. Brine Water with low density | |
| 2. |
Which of the following valves is a small threaded check valve used to isolate wellbore pressure when installing on wellhead outlets? |
| A. | TIW Valve |
| B. | Swab Valve |
| C. | SCSSV |
| D. | Valve Removal Plug |
| Answer» E. | |
| 3. |
Tubing and surface equipment condition is not the which people should consider when determining the maximum pressure while bull heading. |
| A. | True |
| B. | False |
| Answer» C. | |
| 4. |
In workover operation, tripping speed is not important while pulling out of the hole the completion string because the completion brine has less viscous therefore the swabbing will not happen. |
| A. | True |
| B. | False |
| Answer» C. | |