1.

Which type of windmills are been used for primary purposes?

A. Post mill
B. Smock mill
C. Tower mill
D. Fan mill
Answer» E.
2.

Which are further improvements on smock mill?

A. Post mill
B. Smock mill
C. Tower mill
D. Fan mill
Answer» D. Fan mill
3.

Name the type of windmill which consists of a sloping, horizontally weather boarded or thatched tower.

A. Post mill
B. Smock mill
C. Tower mill
D. Fan mill
Answer» C. Tower mill
4.

Name the windmill which has four blades mounted on a central post.

A. Post mill
B. Smock mill
C. Tower mill
D. Fan mill
Answer» B. Smock mill
5.

A wind turbine designed too to come into operation at a minimum wind speed is called _________

A. Cut in velocity
B. Windward
C. Cut out velocity
D. Upwind location
Answer» B. Windward
6.

Maintenance of constant output at all wind speeds above rating is called _________

A. Numeric rating scale
B. Tenancy
C. Flat Rating
D. TRP
Answer» D. TRP
7.

NAME_THE_WINDMILL_WHICH_HAS_FOUR_BLADES_MOUNTED_ON_A_CENTRAL_POST.?$

A. Post mill
B. Smock mill
C. Tower mill
D. Fan mill
Answer» B. Smock mill
8.

Which are further improvements on smock mill?$

A. Post mill
B. Smock mill
C. Tower mill
D. Fan mill
Answer» D. Fan mill
9.

Name_the_type_of_windmill_which_consists_of_a_sloping,_horizontally_weather_boarded_or_thatched_tower.$

A. Post mill
B. Smock mill
C. Tower mill
D. Fan mill
Answer» C. Tower mill
10.

Which_type_of_windmills_are_been_used_for_primary_purposes?

A. Post mill
B. Smock mill
C. Tower mill
D. Fan mill
Answer» E.
11.

How many of windmills are there?

A. 2
B. 3
C. 4
D. 5
Answer» B. 3
12.

Over load factor is also called as _____________

A. availability factor
B. plant operating factor
C. flat rating
D. cut out velocity
Answer» B. plant operating factor
13.

The fraction of time during a given period that the turbine is actually on line is called?

A. Availability factor
B. Flat rating
C. Cut in velocity
D. Cut out velocity
Answer» B. Flat rating
14.

Why is wind turbine designed to stop operation at cut out velocity?

A. To protect wheel against damage
B. To make a quick stop in emergencies
C. To improve the efficiency
D. In order to adjust the blades to wind direction
Answer» B. To make a quick stop in emergencies
15.

A wind turbine designed too to come into operation at a minimum wind speed is called ______

A. Cut in velocity
B. Windward
C. Cut out velocity
D. Upwind location
Answer» B. Windward
16.

Maintenance of constant output at all wind speeds above rating is called _______

A. Numeric rating scale
B. Tenancy
C. Flat Rating
D. TRP
Answer» D. TRP
17.

Why severe fluctuations in power are always undesirable in windmill?

A. Because they pose power oscillations problems
B. Damage of parts due to fluctuations
C. The efficiency of the plant will be reduced
D. Results in damage to the whole plant
Answer» B. Damage of parts due to fluctuations
18.

What is the inherent weakness of all wind machines?

A. Their efficiencies
B. Requires powerful winds to make fan rotate
C. Their dependency on the wind speed
D. Cannot be easily repaired
Answer» D. Cannot be easily repaired