Explore topic-wise MCQs in Concrete Technology.

This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Concrete Technology knowledge and support exam preparation. Choose a topic below to get started.

1.

In the wet process of cement manufacturing raw material is heated to about _____________

A. 650-900 C
B. 900-1300 C
C. 1300-1450 C
D. 900-1050 C
Answer» D. 900-1050 C
2.

In the wet process, the kiln is ___________

A. Horizontal
B. Vertical
C. Slightly inclined with vertical
D. Slightly inclined with horizontal
Answer» D. Slightly inclined with horizontal
3.

When chalk is used _______

A. It is finely broken up and dispersed in water in a wash mill
B. It has to be blasted, then crushed, usually in two progressively smaller crushers
C. It is sieved and fed into a rotating dish called a granulator
D. The raw materials are crushed and fed into a grinding mill, where they are dried and reduced into fine powder
Answer» B. It has to be blasted, then crushed, usually in two progressively smaller crushers
4.

The machinery and equipments do not need much maintenance.

A. True
B. False
Answer» B. False
5.

Size of the kiln needed to manufacture the cement is bigger for wet process.

A. True
B. False
Answer» B. False