This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Concrete Technology knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
In the wet process of cement manufacturing raw material is heated to about _____________ |
| A. | 650-900 C |
| B. | 900-1300 C |
| C. | 1300-1450 C |
| D. | 900-1050 C |
| Answer» D. 900-1050 C | |
| 2. |
In the wet process, the kiln is ___________ |
| A. | Horizontal |
| B. | Vertical |
| C. | Slightly inclined with vertical |
| D. | Slightly inclined with horizontal |
| Answer» D. Slightly inclined with horizontal | |
| 3. |
When chalk is used _______ |
| A. | It is finely broken up and dispersed in water in a wash mill |
| B. | It has to be blasted, then crushed, usually in two progressively smaller crushers |
| C. | It is sieved and fed into a rotating dish called a granulator |
| D. | The raw materials are crushed and fed into a grinding mill, where they are dried and reduced into fine powder |
| Answer» B. It has to be blasted, then crushed, usually in two progressively smaller crushers | |
| 4. |
The machinery and equipments do not need much maintenance. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 5. |
Size of the kiln needed to manufacture the cement is bigger for wet process. |
| A. | True |
| B. | False |
| Answer» B. False | |