1.

Which of the following are not the benefits of the Pressure Drawdown test over the Pressure Build up test?

A. Production continues during the test period
B. Reservoir volume in communication with the wellbore can be estimated
C. Production continues during the test period as well as Reservoir volume in communication with the wellbore
D. Production ceases during the test period
Answer» E.
2.

Which of the following is Miller- Dyes- Hutchinson equation?

A. P<sub>ws</sub> = P<sub>i</sub> (162.6q B/kh)* log((t<sub>p</sub> + t)/ t)
B. P<sub>ws</sub> = P<sub>i</sub> (141.2q B/kh)* log((t<sub>p</sub> + t)/ t)
C. P<sub>ws</sub> = P<sub>1hr</sub> + (162.6q B/kh).log( t)
D. P<sub>ws</sub> = P<sub>1hr</sub> + (141.2q B/kh).log( t)
Answer» C. P<sub>ws</sub> = P<sub>1hr</sub> + (162.6q B/kh).log( t)
3.

Damage Ratio is the inverse of the Flow efficiency.

A. True
B. False
Answer» B. False
4.

How can be the pressure drop across the skin is calculated (all signs have their original meanings)?

A. P<sub>skin</sub>= 141.2q Bs/kh
B. P<sub>skin</sub>=141.2qkh/ Bs
C. P<sub>skin</sub>=141.2q ks/Bh
D. P<sub>skin</sub>=162.2q Bs/kh
Answer» B. P<sub>skin</sub>=141.2qkh/ Bs
5.

For Pseudo- Steady state flow which of the following is correct in which P,t represents Pressure and time respectively?

A. dP/dt =0
B. dP/dt =constant
C. dP/dt =infinity
D. dP/dt =1
Answer» E.