This section includes 17 Mcqs, each offering curated multiple-choice questions to sharpen your Geotechnical Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
The method that is used to avoid the further increase in tilt is ___________ |
| A. | Pushing by jack |
| B. | Eccentric loading |
| C. | Strutting the well |
| D. | Pushing the well |
| Answer» D. Pushing the well | |
| 2. |
In which of the following methods, hydraulic jack is used to counter attack the tilt in the well? |
| A. | Pulling the well |
| B. | Eccentric loading |
| C. | Pushing by jack |
| D. | Pulling the well |
| Answer» D. Pulling the well | |
| 3. |
The radius of the well curb should be kept _________ larger than the outside radius of well steining. |
| A. | 2 cm and 4 cm |
| B. | 2 m |
| C. | All of the mentioned |
| D. | None of the mentioned |
| Answer» B. 2 m | |
| 4. |
Unequal dredging of well causes _________ |
| A. | Collapsing of well |
| B. | Tilting |
| C. | Open excavation |
| D. | Maximum skin friction |
| Answer» C. Open excavation | |
| 5. |
Excavation of soil inside the well in river beds can be done by ________ |
| A. | Auger |
| B. | Sending in Workers |
| C. | Special equipment |
| D. | None of the mentioned |
| Answer» B. Sending in Workers | |
| 6. |
The inside shuttering of the well curb is made up of _________ |
| A. | Steel |
| B. | Wood |
| C. | Brick masonry |
| D. | Concrete |
| Answer» D. Concrete | |
| 7. |
Laying of the well curb in river bed having water, is done by _________ |
| A. | Draining out the water |
| B. | Diverting the water |
| C. | Constructing cofferdams |
| D. | None of the mentioned |
| Answer» D. None of the mentioned | |
| 8. |
IN_WHICH_OF_THE_FOLLOWING_METHODS,_HYDRAULIC_JACK_IS_USED_TO_COUNTER_ATTACK_THE_TILT_IN_THE_WELL??$ |
| A. | Pulling the well |
| B. | Eccentric loading |
| C. | Pushing by jack |
| D. | Pulling the well |
| Answer» D. Pulling the well | |
| 9. |
The_method_that_is_used_to_avoid_the_further_increase_in_tilt_is___________$ |
| A. | Pushing by jack |
| B. | Eccentric loading |
| C. | Strutting the well |
| D. | Pushing the well |
| Answer» D. Pushing the well | |
| 10. |
To counter act the tilts in the well during sinking operations, which of the following measures can be used? |
| A. | Regulation of grabbing |
| B. | Strutting the well |
| C. | Pushing by jack |
| D. | All of the mentioned |
| Answer» E. | |
| 11. |
The radius of the well curb should be kept_________ larger than the outside radius of well steining. |
| A. | 2 cm and 4 cm |
| B. | 2 m |
| C. | All of the mentioned |
| D. | None of the mentioned |
| Answer» B. 2 m | |
| 12. |
Unequal dredging of well causes_________ |
| A. | Collapsing of well |
| B. | Tilting |
| C. | Open excavation |
| D. | Maximum skin friction |
| Answer» C. Open excavation | |
| 13. |
When the well is sunk deeper, the skin friction is decreased by which of the following method? |
| A. | Use of phawrah jhams |
| B. | By tilting and shifting |
| C. | By applying kentledge |
| D. | All of the mentioned |
| Answer» D. All of the mentioned | |
| 14. |
Excavation of soil inside the well in river beds can be done by________ |
| A. | Auger |
| B. | Sending in Workers |
| C. | Special equipment |
| D. | None of the mentioned |
| Answer» B. Sending in Workers | |
| 15. |
The inside shuttering of the well curb is made up of_________ |
| A. | Steel |
| B. | Wood |
| C. | Brick masonry |
| D. | Concrete |
| Answer» D. Concrete | |
| 16. |
To avoid the setting of the cutting edge unevenly, ___________ can be introduced. |
| A. | Wooden sleepers |
| B. | Smooth oil surface |
| C. | Bottom plug |
| D. | Steining bars |
| Answer» B. Smooth oil surface | |
| 17. |
Laying of the well curb in river bed having water, is done by_________ |
| A. | Draining out the water |
| B. | Diverting the water |
| C. | Constructing cofferdams |
| D. | None of the mentioned |
| Answer» D. None of the mentioned | |