1.

The bottom plug is designed in _________ shape.

A. Rectangular
B. Mushroom
C. Bowl-shaped
D. Circular
Answer» D. Circular
2.

The skin friction developed in San Francisco Oakland Bay Bridge, was reduced by, which of the following methods?

A. By introducing special equipment
B. By coating smooth oil surface
C. By decreasing the stress developed
D. All of the mentioned
Answer» C. By decreasing the stress developed
3.

Frictional resistance developed during the sinking the well depends on __________

A. Roughness of the surface of contact
B. Diameter of the well
C. Type of soil
D. Lateral earth pressure
Answer» B. Diameter of the well
4.

For loose sand, the value of skin friction is between ________

A. 0.73-2.93
B. 4.9-19.5
C. 1.22-3.42
D. 3.42-6.84
Answer» D. 3.42-6.84
5.

At a given depth, the skin friction of the well is equal to __________

A. Diameter of well
B. times the lateral earth pressure
C. Stress condition
D. All of the mentioned
Answer» C. Stress condition
6.

A sharp vertical edge for the well is provided at _________

A. Inner Face of the well
B. Out of the well
C. Outside face of the caisson
D. All of the mentioned
Answer» D. All of the mentioned
7.

The cutting edge should be provided with an angle of __________

A. 45
B. 60
C. 90
D. 30
Answer» E.
8.

An effective well curb should withstand ___________

A. Maximum stress
B. Stress due to sand blows
C. Its own weight
D. Blasting
Answer» C. Its own weight