Explore topic-wise MCQs in Petroleum Production Operations.

This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.

1.

What does SIBHP mean?

A. System bottom hole pressure
B. Static hole pressure
C. System induced bottom hole pressure
D. Shut in bottom hole pressure
Answer» E.
2.

Which of the following is not an advantage of multiple tubingless completions?

A. Reduced Cost
B. Production rate control
C. Each zone is independent
D. Simplified procedures
Answer» C. Each zone is independent
3.

What type of well completion is this, consider the outer cylindrical wall to be just the borehole in which other 3 strings are cemented and perforated?

A. Conventional tubular configuration
B. Unconventional tubular configuration
C. Single tubingless completion
D. Multiple string single packer
Answer» C. Single tubingless completion
4.

Multiple tubingless completions were originally applied to 2 7/8” pipe.

A. True
B. False
Answer» B. False
5.

Multiple tubingless completions are also known as Unconventional Tubular Configurations.

A. True
B. False
Answer» B. False