MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
In general, when a perforation job is to be done then a Casing-Collar- Locator (CCL log) is also run to ensure the correct depth. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 2. |
Which of the following is a Cased hole completion? |
| A. | Casings are run into the zone of interest |
| B. | Casings aren’t run into the zone of interest |
| C. | Casings are not used inside the well |
| D. | Cementing is not done in the well |
| Answer» B. Casings aren’t run into the zone of interest | |
| 3. |
The full form of BOP is _____ |
| A. | Bottom hole Pressure |
| B. | Bottom Oil Price |
| C. | Below Optimum Pressure |
| D. | Blow Out Preventer |
| Answer» E. | |
| 4. |
What is a dog-leg in oil and gas well drilling? |
| A. | Bore hole |
| B. | Place near the perforation |
| C. | Logging data obtained |
| D. | Changing of well trajectory rapidly |
| Answer» E. | |
| 5. |
Pseudo pressure is a pressure function that considers the variable compressibility and viscosity of gas with respect to temperature. |
| A. | True |
| B. | False |
| Answer» C. | |