| 1. | 
                                    The length of Indus river is: | 
                            
| A. | 2736 km | 
| B. | 2803 km | 
| C. | 2990 km | 
| D. | 3050 km | 
| Answer» B. 2803 km | |
| 2. | 
                                    Indus river originate from: | 
                            
| A. | Azad Kashmir | 
| B. | Western Tibet | 
| C. | Kashgar | 
| D. | Upper Sindh | 
| Answer» C. Kashgar | |
| 3. | 
                                    The maximum discharge of water in Indus River under normal climatic conditions is around: | 
                            
| A. | 63 MAF | 
| B. | 73 MAF | 
| C. | 83 MAF | 
| D. | 93 MAF | 
| Answer» E. | |
| 4. | 
                                    The length of Chenab river is: | 
                            
| A. | 974 km | 
| B. | 1230 km | 
| C. | 1350 km | 
| D. | 1403 km | 
| Answer» B. 1230 km | |
| 5. | 
                                    Chenab river originate from the mountainous range of: | 
                            
| A. | Suleman | 
| B. | Karakoram | 
| C. | Himalayas | 
| D. | Hindu Kush | 
| Answer» D. Hindu Kush | |
| 6. | 
                                    The maximum discharge of water in Chenab river under normal climatic conditions is around: | 
                            
| A. | 18 MAF | 
| B. | 22 MAF | 
| C. | 26 MAF | 
| D. | 30 MAF | 
| Answer» D. 30 MAF | |
| 7. | 
                                    Jhelum river join Chenab river near: | 
                            
| A. | Trimmu | 
| B. | Marala | 
| C. | Punjnad | 
| D. | None of the Above | 
| Answer» B. Marala | |
| 8. | 
                                    The maximum discharge of water in Jhelum river under normal climatic conditions is around: | 
                            
| A. | 17 MAF | 
| B. | 19 MAF | 
| C. | 22 MAF | 
| D. | 23 MAF | 
| Answer» E. | |
| 9. | 
                                    Which of the following rivers rises from a deep spring at Vernag, in the Indian held section of Jammu and Kashmir state: | 
                            
| A. | Ravi | 
| B. | Jhelum | 
| C. | Kabul | 
| D. | Sutlej | 
| Answer» C. Kabul | |
| 10. | 
                                    River Kabul joins the Indus river at: | 
                            
| A. | Mohmand Agency | 
| B. | Attock | 
| C. | Peshawar | 
| D. | Gilgit | 
| Answer» C. Peshawar | |
| 11. | 
                                    Ravi river originate in the Indian state of: | 
                            
| A. | Orissa | 
| B. | Hamachel Pardesh | 
| C. | Andra Pardesh | 
| D. | Utter Pardesh | 
| Answer» C. Andra Pardesh | |
| 12. | 
                                    The total storage capacity of different water reservoirs in Pakistan is around: | 
                            
| A. | 17.1 MAF | 
| B. | 22.2 MAF | 
| C. | 34.5 MAF | 
| D. | 39.1 MAF | 
| Answer» B. 22.2 MAF | |
| 13. | 
                                    River Kabul originate from north eastern Afghanistan, its length is: | 
                            
| A. | 480 km | 
| B. | 550 km | 
| C. | 580 km | 
| D. | 705 km | 
| Answer» D. 705 km | |
| 14. | 
                                    Tarbela Dam was constructed in 1976 on: | 
                            
| A. | Indus river | 
| B. | Jhelum river | 
| C. | Chenab river | 
| D. | Kabul river | 
| Answer» B. Jhelum river | |
| 15. | 
                                    The total storage capacity of Tarbela Dam under normal climatic conditions is: | 
                            
| A. | 7.5 MAF | 
| B. | 8.3 MAF | 
| C. | 9.7 MAF | 
| D. | 11.6 MAF | 
| Answer» E. | |
| 16. | 
                                    The main purpose for constructing of Tarbela Dam was: | 
                            
| A. | Irrigation | 
| B. | Hydropower generating | 
| C. | Both the above | 
| D. | None of the above | 
| Answer» D. None of the above | |
| 17. | 
                                    The National Drainage Programme (NDP) was launched in | 
                            
| A. | 1997 | 
| B. | 1998 | 
| C. | 1999 | 
| D. | 2000 | 
| Answer» C. 1999 | |
| 18. | 
                                    The gross water storage capacity of Mangla Dam is: | 
                            
| A. | 5.88 MAF | 
| B. | 4.77 MAF | 
| C. | 3.55 MAF | 
| D. | 2.66 MAF | 
| Answer» B. 4.77 MAF | |
| 19. | 
                                    Mangla Dam was constructed on river Jhelum in: | 
                            
| A. | 1960 | 
| B. | 1962 | 
| C. | 1966 | 
| D. | 1969 | 
| Answer» D. 1969 | |
| 20. | 
                                    The world's twelfth largest earthfill dam is: | 
                            
| A. | Salal Dam (Jammu & Kashmir) | 
| B. | Aswan Dam (Egypt) | 
| C. | Mangla Dam (Pakistan) | 
| D. | None of the above | 
| Answer» D. None of the above | |
| 21. | 
                                    Hydropower generating capacity of Mangla Dam is: | 
                            
| A. | 200 MW | 
| B. | 500 MW | 
| C. | 700 MW | 
| D. | 1000 MW | 
| Answer» E. | |
| 22. | 
                                    Chashma Barrage was built in 1971 on river: | 
                            
| A. | Jhelum | 
| B. | Beas | 
| C. | Indus | 
| D. | Sutlej | 
| Answer» D. Sutlej | |
| 23. | 
                                    Islam Barrage is on: | 
                            
| A. | River Ravi | 
| B. | River Jhelum | 
| C. | River Sutlej | 
| D. | River Chenab | 
| Answer» D. River Chenab | |
| 24. | 
                                    The main purpose of Chashma Barrage is: | 
                            
| A. | Hydro power generating | 
| B. | Irrigation of land | 
| C. | Controlling water logging and salinity problem | 
| D. | Providing water to the Tarbela Lake | 
| Answer» C. Controlling water logging and salinity problem | |
| 25. | 
                                    The live water storage capacity of this Barrage is: | 
                            
| A. | 0.61 MAF | 
| B. | 1.7 MAF | 
| C. | 2.2 MAF | 
| D. | 2.9 MAF | 
| Answer» B. 1.7 MAF | |
| 26. | 
                                    Warsak Dam was built in 1960 on river: | 
                            
| A. | Indus | 
| B. | Jhelum | 
| C. | Dasht | 
| D. | Kabul | 
| Answer» E. | |
| 27. | 
                                    The storage of water capacity of Warsak Dam is around: | 
                            
| A. | 0.04 MAF | 
| B. | 0.06 MAF | 
| C. | 1.2 MAF | 
| D. | 0.09 MAF | 
| Answer» B. 0.06 MAF | |
| 28. | 
                                    Indus water dispute arose on _____ when India stopped the irrigation supplies coming to Pakistan. | 
                            
| A. | April 1, 1947 | 
| B. | April 1, 1948 | 
| C. | April 1, 1949 | 
| D. | April 1, 1950 | 
| Answer» C. April 1, 1949 | |
| 29. | 
                                    The Indus and its five main tributaries all combine into one river near: | 
                            
| A. | Sialkot | 
| B. | Gawadar | 
| C. | Mithan Kot | 
| D. | Shikarpur | 
| Answer» D. Shikarpur | |
| 30. | 
                                    Which is the first multipurpose dam built by Pakistan after independence? | 
                            
| A. | Tarbela dam | 
| B. | Mangla dam | 
| C. | Warsak dam | 
| D. | Khushdil Khan dam | 
| Answer» D. Khushdil Khan dam | |
| 31. | 
                                    Indus Water Treaty was signed in Karachi on | 
                            
| A. | 19 September 1960 | 
| B. | 19 September 1961 | 
| C. | 19 September 1962 | 
| D. | 19 September 1963 | 
| Answer» B. 19 September 1961 | |
| 32. | 
                                    Since Mangla dam s first impounding in 1967, its gross storage capacity has reduced to 4.75 MAF from the actual design of 5.88 MAF due to | 
                            
| A. | Poor irrigation management | 
| B. | Waterlogging | 
| C. | Soil salinity | 
| D. | Sedimentation | 
| Answer» E. | |
| 33. | 
                                    To solve Indus Water dispute, negotiations under the offices of the world Bank commenced in: | 
                            
| A. | May 1949 | 
| B. | May 1950 | 
| C. | May 1951 | 
| D. | May 1952 | 
| Answer» E. | |
| 34. | 
                                    The Sutlej Valley Project committee was setup in | 
                            
| A. | 1922 | 
| B. | 1932 | 
| C. | 1942 | 
| D. | 1952 | 
| Answer» C. 1942 | |
| 35. | 
                                    The Sutlej Valley Tripartite Agreement was signed by the Punjab, Bhawalpur and Bikanir states in: | 
                            
| A. | 1910 | 
| B. | 1915 | 
| C. | 1920 | 
| D. | 1925 | 
| Answer» D. 1925 | |
| 36. | 
                                    For the water apportionment of the Indus and its tributaries, a committee was constituted in October 1970 under the chairmanship: | 
                            
| A. | Justice Fazle Akbar | 
| B. | Justice Hamud-ur-Rehman | 
| C. | Justice Muhammad Munir | 
| D. | Justice Irshad Hassan Khan | 
| Answer» B. Justice Hamud-ur-Rehman | |
| 37. | 
                                    The 1991 Water Accord also called Water Apportionment Accord was signed by: | 
                            
| A. | Governors of the four provinces | 
| B. | Chief Ministers of the four province | 
| C. | Chief Secretaries of the four provinces | 
| D. | None of the above | 
| Answer» C. Chief Secretaries of the four provinces | |
| 38. | 
                                    Which of the following is the smallest barrage? | 
                            
| A. | Sukkur Barrage | 
| B. | Chasma Barrage | 
| C. | Taunsa Barrage | 
| D. | Kotri Barrage | 
| Answer» D. Kotri Barrage | |
| 39. | 
                                    The Water Accord 1991 was signed on March 16 in | 
                            
| A. | Lahore | 
| B. | Islamabad | 
| C. | Karachi | 
| D. | Peshawar | 
| Answer» D. Peshawar | |
| 40. | 
                                    The current estimated irrigation efficiency in Pakistan is just | 
                            
| A. | 25.5% | 
| B. | 35.5% | 
| C. | 45.5% | 
| D. | 55.5% | 
| Answer» C. 45.5% | |
| 41. | 
                                    Under the chairmanship of Akhtar Hussain, the Water Allocation and Rates Committee was constituted in | 
                            
| A. | 1965 | 
| B. | 1967 | 
| C. | 1968 | 
| D. | 1969 | 
| Answer» D. 1969 | |
| 42. | 
                                    Pakistan asked the world Bank to appoint a neutral expert to resolve the dispute arising out of the construction of | 
                            
| A. | Baglihar Dam | 
| B. | Assan Dam | 
| C. | Wullar dam | 
| D. | None of the above | 
| Answer» B. Assan Dam | |
| 43. | 
                                    Khanpur Dam was built in 1984 on River: | 
                            
| A. | Hunza | 
| B. | Soan | 
| C. | Haro | 
| D. | Hingol | 
| Answer» D. Hingol | |
| 44. | 
                                    Baran Dam in Pakistan was built in 1962 on river: | 
                            
| A. | Hingol | 
| B. | Kurram | 
| C. | Kabul | 
| D. | Zoab | 
| Answer» C. Kabul | |
| 45. | 
                                    Tanda Dam built in 1965 on river: | 
                            
| A. | Dasht | 
| B. | Kohat-Toi | 
| C. | Soan | 
| D. | Kurram | 
| Answer» C. Soan | |
| 46. | 
                                    Water and Power Development Authority (WAPDA) was created in: | 
                            
| A. | 1949 | 
| B. | 1959 | 
| C. | 1969 | 
| D. | 1979 | 
| Answer» C. 1969 | |
| 47. | 
                                    The Hydropower generating capacity of Bhasha Dam would be: | 
                            
| A. | 3000 MW | 
| B. | 3360 MW | 
| C. | 3550 MW | 
| D. | 3700 MW | 
| Answer» C. 3550 MW | |
| 48. | 
                                    Under Wapda "Vision 2025" programme, Bhasha Dam would be constructed on river: | 
                            
| A. | Indus | 
| B. | Ravi | 
| C. | Jhelum | 
| D. | Chenab | 
| Answer» B. Ravi | |
| 49. | 
                                    The purpose of Rawal Dam is: | 
                            
| A. | To provide potable water to Rawalpindi | 
| B. | To provide potable water to Islamabad | 
| C. | To irrigate small area around Islamabad | 
| D. | All the above | 
| Answer» E. | |
| 50. | 
                                    The Hydropower generating capacity of Kalabagh Dam would be: | 
                            
| A. | 3400 MW | 
| B. | 3500 MW | 
| C. | 3600 MW | 
| D. | 3700 MW | 
| Answer» D. 3700 MW | |