| 1. |
_______ is necessary to provide at suitable vertical distance in multi storage buildings. |
| A. | Push cocks |
| B. | Water tanks |
| C. | Wheel valve |
| D. | Relief valves |
| Answer» E. | |
| 2. |
The concussive or violently shaking type fitted _______ for the flushing of WC pans leads to vibration. |
| A. | Spouts |
| B. | Slab |
| C. | Toilets |
| D. | Push cocks |
| Answer» E. | |
| 3. |
The joints in the _________ of WC seats and nahni trap should be filled with rich cement mortar and cured for 7 days. |
| A. | Plumbing |
| B. | Spouts |
| C. | Traps |
| D. | Toilet |
| Answer» B. Spouts | |
| 4. |
For the overhead RCC ___________ it should be seen that the permissible limits of stresses relating to resistance to cracking are not exceeded. |
| A. | Relief valves |
| B. | Water tanks |
| C. | Push cocks |
| D. | Taps |
| Answer» C. Push cocks | |
| 5. |
When compound like ____________ is added to cement during construction, it prevents seepage, leakage and damp cause by capillary absorption. |
| A. | Puldo |
| B. | POP |
| C. | Steel |
| D. | Chlorine |
| Answer» B. POP | |
| 6. |
In _________ method, a layer of hot mastic Asphalt is laid on the roof surface. |
| A. | Dampness |
| B. | Termite proofing |
| C. | Mastic Asphalt |
| D. | Roofing |
| Answer» D. Roofing | |
| 7. |
In __________ method, the surface of RCC slab is kept rough and on this surface a layer of concrete is laid. |
| A. | Mastic Asphalt |
| B. | Finishing |
| C. | Bedding Concrete |
| D. | Finishing |
| Answer» D. Finishing | |
| 8. |
The remedy lies in _________ initially with epoxy mortar or at least later stage while repairing the causes of the problems due to aging. |
| A. | Push cocks |
| B. | Filling of joints |
| C. | Design of floor slab |
| D. | Plumbing |
| Answer» C. Design of floor slab | |