MCQOPTIONS
Saved Bookmarks
This section includes 4 Mcqs, each offering curated multiple-choice questions to sharpen your Civil Engineering Drawing knowledge and support exam preparation. Choose a topic below to get started.
1. |
Estimation cost provided for water supply and electrification is __________ |
A. | 4% and 6% |
B. | 18% and 18% |
C. | 08% and 08% |
D. | 12% and 15% |
Answer» D. 12% and 15% | |
2. |
Large cornice is measured in ________ |
A. | q ft |
B. | g ft |
C. | r ft |
D. | t ft |
Answer» D. t ft | |
3. |
Multiplying factor for prefix atto is _______ |
A. | 10<sup>-8</sup> |
B. | 10<sup>18</sup> |
C. | 10<sup>-18</sup> |
D. | 10<sup>8</sup> |
Answer» D. 10<sup>8</sup> | |
4. |
Earthwork in plinth filling is calculated by taking _____________ |
A. | External dimensions b/w plinth walls |
B. | Vertical dimensions b/w plinth walls |
C. | Internal dimensions b/w plinth walls |
D. | Total dimensions b/w plinth walls |
Answer» D. Total dimensions b/w plinth walls | |