MCQOPTIONS
Saved Bookmarks
This section includes 10 Mcqs, each offering curated multiple-choice questions to sharpen your Irrigation Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
Which type of dam is suitable on shallow pervious foundations? |
A. | Zoned embankment type |
B. | Homogenous embankment type |
C. | Both Non-homogenous type and homogenous type |
D. | Diaphragm type |
Answer» B. Homogenous embankment type | |
2. |
The central core of the zoned embankment type earth dam ________________________ |
A. | checks the seepage |
B. | prevents piping |
C. | gives stability to the central impervious fill |
D. | distribute the load over a large area |
Answer» B. prevents piping | |
3. |
The process of laying and compacting earth in layers by power rollers under OMC for construction of earthen dams is known as ______________________ |
A. | Rolled fill method |
B. | Hydraulic fill method |
C. | OMC method |
D. | Compaction |
Answer» B. Hydraulic fill method | |
4. |
During the construction of an earthen dam by hydraulic fill method, development of pore pressure becomes important in the __________________ |
A. | central impervious core |
B. | pervious outer shell |
C. | transition zone |
D. | both central core and outer shell |
Answer» B. pervious outer shell | |
5. |
Which of the following statement is correct with reference to earthen dams? |
A. | These dams are very costly as compared to other types |
B. | Gravity dams are less susceptible to failure as compared to rigid dams |
C. | These dams are suitable for construction on almost every type of foundation |
D. | Highly skilled labor is generally not required |
Answer» D. Highly skilled labor is generally not required | |
6. |
The blanket in earth dam is provided ___________________ |
A. | at the ground level on u/s side |
B. | at the ground level on the d/s side |
C. | at the ground level of the D/s side of the dam |
D. | on the D/s slope |
Answer» B. at the ground level on the d/s side | |
7. |
Which embankment has the thickness of the diaphragm at an elevation less than 10 meters or the height of the embankment above the corresponding elevation? |
A. | Diaphragm type dam |
B. | Zoned type dam |
C. | Non-homogenous earth dam |
D. | Homogenous earth dam |
Answer» B. Zoned type dam | |
8. |
Which of the following soil material is most preferred for the central core material of zoned embankment type dam? |
A. | Highly impervious clay |
B. | Sands or silty clays |
C. | Coarse sands |
D. | Gravels |
Answer» C. Coarse sands | |
9. |
Which of the following zone in Zoned type embankment prevents piping through cracks? |
A. | Central core |
B. | Transition zone |
C. | Outer zone |
D. | Core wall |
Answer» C. Outer zone | |
10. |
Which of the following earth dam is suitable only on impervious foundation? |
A. | Zoned embankment type |
B. | Homogenous embankment type |
C. | Non-homogenous type |
D. | Diaphragm type |
Answer» C. Non-homogenous type | |