| 1. |
Lead content has to be checked in ground water analysis. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 2. |
The directions of the ground water flow have to be established with _________ |
| A. | State Ground Water Board |
| B. | Water Control Board |
| C. | PCB |
| D. | SPCB |
| Answer» B. Water Control Board | |
| 3. |
The ground water flow direction has to be ascertained periodically and reported at least __________ |
| A. | Once in a year |
| B. | Once in two years |
| C. | Once in three years |
| D. | Once in four years |
| Answer» D. Once in four years | |
| 4. |
If no open wells are available, action needs to be taken to provide at least _________ monitoring wells. |
| A. | 1 |
| B. | 2 |
| C. | 3 |
| D. | 4 |
| Answer» E. | |
| 5. |
Ground water samples should be collected at least up to a distance ________ km. |
| A. | 2 |
| B. | 3 |
| C. | 4 |
| D. | 5 |
| Answer» E. | |
| 6. |
Ground water pH has to be analysed in monitoring. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 7. |
Ground water characteristics has to be monitored at least once in a _________ till design span. |
| A. | Week |
| B. | Month |
| C. | Day |
| D. | Quarter |
| Answer» E. | |