MCQOPTIONS
Saved Bookmarks
This section includes 4 Mcqs, each offering curated multiple-choice questions to sharpen your Railway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
Over the years what has led to an increase in necessity for maintenance and improvement in track structures? |
| A. | Increased track loading |
| B. | Poor quality of tracks |
| C. | Poor formation strength |
| D. | Improper construction work |
| Answer» B. Poor quality of tracks | |
| 2. |
In need based directed track maintenance system, work is done round the clock. |
| A. | True |
| B. | False |
| Answer» C. | |
| 3. |
Which among the following is an old method for track maintenance? |
| A. | Measured shovel packing |
| B. | Beater packing |
| C. | Mechanised maintenance |
| D. | Directed track maintenance |
| Answer» C. Mechanised maintenance | |
| 4. |
Why is the maintenance of Permanent way important? |
| A. | To ensure safety of public |
| B. | For comfort of travellers |
| C. | To ensure safety and comfort of public |
| D. | To make the project economical |
| Answer» D. To make the project economical | |