| 1. | What is arrow diagram in TQM? | 
| A. | A diagram used to plan the most appropriate schedule | 
| B. | Diagram shows the relationship strength between the variables | 
| C. | Used large amount of data and organise it on the basis of natural relationship between items | 
| D. | Diagram showing the sequencing and inter relationships between factors | 
| Answer» B. Diagram shows the relationship strength between the variables | |
| 2. | What is the formula for process capability index? | 
| A. | (1-K)Cp | 
| B. | (1+K)Cp | 
| C. | (1-Cp)K | 
| D. | (1+Cp)K | 
| Answer» B. (1+K)Cp | |
| 3. | Which technique is used to relate complex cause and effect relationships? | 
| A. | Affinity diagram | 
| B. | Pareto diagram | 
| C. | Scatter diagram | 
| D. | Interrelationship diagram | 
| Answer» E. | |
| 4. | What is the key step in Taguchi’s approach? | 
| A. | Tolerance design | 
| B. | System design | 
| C. | Parameter design | 
| D. | Process design | 
| Answer» D. Process design | |
| 5. | WHAT_IS_THE_FORMULA_FOR_PROCESS_CAPABILITY_INDEX??$ | 
| A. | (1-K)C<sub>p</sub> | 
| B. | (1+K)C<sub>p</sub> | 
| C. | (1-C<sub>p</sub>)K | 
| D. | (1+C<sub>p</sub>)K | 
| Answer» B. (1+K)C<sub>p</sub> | |
| 6. | Which tool is used to analyse the effects of a failure of individual components on the system? | 
| A. | FTA | 
| B. | FMEA | 
| C. | Quality circles | 
| D. | Fool proofing | 
| Answer» C. Quality circles | |
| 7. | How many control charts are normally used for statistical control of variables? | 
| A. | 1 | 
| B. | 2 | 
| C. | 3 | 
| D. | 4 | 
| Answer» D. 4 | |
| 8. | What is the first step in problem solving process? | 
| A. | Plan | 
| B. | Do | 
| C. | Check | 
| D. | Action | 
| Answer» B. Do | |
| 9. | What is PDPC? | 
| A. | A statistical tool | 
| B. | Quality improvement technique | 
| C. | Quality assurance technique | 
| D. | Statistical process control technique | 
| Answer» C. Quality assurance technique | |
| 10. | What is called the stratification of information? | 
| A. | Breaking down a whole group into smaller sub groups | 
| B. | Isolating the vital few from the trivial many | 
| C. | Grouping of scattered information | 
| D. | Sequencing of processes in a quality system | 
| Answer» B. Isolating the vital few from the trivial many | |
| 11. | What is the key step in Taguchi’s approach?$ | 
| A. | Tolerance design | 
| B. | System design | 
| C. | Parameter design | 
| D. | Process design | 
| Answer» D. Process design | |
| 12. | Which statistical technique integrates product design and manufacturing process? | 
| A. | Tree analysis | 
| B. | Problem solving techniques | 
| C. | Quality function deployment | 
| D. | Taguchi approach | 
| Answer» E. | |