

MCQOPTIONS
Saved Bookmarks
This section includes 15 Mcqs, each offering curated multiple-choice questions to sharpen your Statistical Quality Control knowledge and support exam preparation. Choose a topic below to get started.
1. |
The EWMA charts are recommended for phase II applications as it is totally a nonparametric procedure. |
A. | True |
B. | False |
Answer» B. False | |
2. |
The signal resistance value depends on the value chosen for . |
A. | True |
B. | False |
Answer» B. False | |
3. |
In the case of Shewhart charts, if the data is not according to the normal distribution, the actual in-control ARL (ARL0) will be ____________ the expected value. |
A. | Considerably higher than |
B. | Considerably lower than |
C. | Equal to |
D. | Almost equal to |
Answer» C. Equal to | |
4. |
Which of these is not an advantage of low value of in the case of EWMA charts? |
A. | Good ARL performance |
B. | Insensitivity to the normality of the data |
C. | Good ability to detect the larger process shifts |
D. | Easy detection of small process shifts |
Answer» E. | |
5. |
Which of these is not an advantage of using a Shewhart control chart with the EWMA chart? |
A. | Detection of larger process shifts |
B. | ARL adjustment |
C. | Counteraction to the high signal resistance value |
D. | No defects |
Answer» E. | |
6. |
Who were the first persons to recommend the use of Shewhart control charts with the EWMA charts with low values of ? |
A. | Woodall and Mahmoud |
B. | Woodall and Roberts |
C. | Roberts and Mahmoud |
D. | Roberts and Crowder |
Answer» B. Woodall and Roberts | |
7. |
Which of these methods can be used to counteract the signal resistance in case of small values of with EWMA charts? |
A. | To use a cusum chart paralleled |
B. | To use a Shewhart control chart paralleled |
C. | To just wait for EWMA chart to be plotted till 50 observations |
D. | To increase the value of process mean target |
Answer» C. To just wait for EWMA chart to be plotted till 50 observations | |
8. |
Small values of gives ______ values of the SR (EWMA). |
A. | Larger |
B. | Lower |
C. | Equal |
D. | Both, larger and smaller |
Answer» B. Lower | |
9. |
Which of these is the maximum value of the SR averaged over all values of EWMA statistic? |
A. | (SR_{max} (EWMA)=L frac{(2- )}{ } ) |
B. | (SR_{max}(EWMA)=L sqrt{ frac{(2- )}{ }} ) |
C. | (SR_{max} (EWMA)=L+ sqrt{ frac{(2- )}{ }} ) |
D. | (SR_{max} (EWMA)=L- sqrt{ frac{(2- )}{ }} ) |
Answer» C. (SR_{max} (EWMA)=L+ sqrt{ frac{(2- )}{ }} ) | |
10. |
What is the value of the term w called in the SR value of a EWMA chart? |
A. | First EWMA value |
B. | Last EWMA value |
C. | Value of EWMA statistic |
D. | Weight average |
Answer» D. Weight average | |
11. |
What is the value of SR for an EWMA chart? |
A. | SR(EWMA)= ( frac{L sqrt{ frac{ }{2- }}+( -1)w}{ } ) |
B. | SR(EWMA)= ( frac{L sqrt{ frac{ }{2- }}-(1- )w}{ } ) |
C. | SR(EWMA)= ( frac{L sqrt{ frac{ }{2- }}-( -1)w}{ } ) |
D. | SR(EWMA)= ( frac{L sqrt{ frac{ }{2- }}+(1- )w}{ } ) |
Answer» C. SR(EWMA)= ( frac{L sqrt{ frac{ }{2- }}-( -1)w}{ } ) | |
12. |
Which of these is not having a constant SR value? |
A. | c-chart |
B. | R-chart |
C. | p-chart |
D. | EWMA chart |
Answer» E. | |
13. |
Which of these is a having a constant SR? |
A. | A chart |
B. | A Cusum chart |
C. | An EWMA chart |
D. | Every control chart |
Answer» B. A Cusum chart | |
14. |
For a Shewhart control chart, what is the value of SR? |
A. | Z<sub> /2</sub> |
B. | 2 |
C. | L |
D. | 2L |
Answer» D. 2L | |
15. |
The largest standard deviation of the sample mean from the target, not leading to an immediate out-of-control signal, is called _______________ of a control chart. |
A. | ARL |
B. | UCL |
C. | Signal resolution |
D. | Signal resistance |
Answer» E. | |