1. |
A change of process mean changes the value of Ci>Ci-1, so we can say that the process mean has shifted upwards. |
A. | True |
B. | False |
Answer» B. False | |
2. |
Upward or downward shifts in the Cusum value, directly indicate changes in process condition. |
A. | True |
B. | False |
Answer» B. False | |
3. |
If the value of xi=9.29, and Ci-1=-2.56, what will be the value of the cumulative sum for this sample, if the value of 0=10? |
A. | -3.27 |
B. | -5.13 |
C. | 3.27 |
D. | 5.13 |
Answer» B. -5.13 | |
4. |
Which of these is another form of the cumulative sum value plotted on the cumulative sum chart? |
A. | (C_i=(x_i- )+ sum_{j=1}^{i-1} (x_j+ ) ) |
B. | (C_i=(x_i- )+C_{i-1} ) |
C. | (C_i=(x_i- )+ sum_{j=1}^{i-1} (x_j+2 ) ) |
D. | (C_i=(x_i- )-C_{i-1} ) |
Answer» C. (C_i=(x_i- )+ sum_{j=1}^{i-1} (x_j+2 ) ) | |
5. |
Which of these conditions don t describe an assignable cause in the process? |
A. | A positive shift in the Cusum value |
B. | A negative shift in the Cusum value |
C. | Random change in Cusum value |
D. | Continuous upward drift of Cusum value after a continuous downward drift in the Cusum value |
Answer» D. Continuous upward drift of Cusum value after a continuous downward drift in the Cusum value | |
6. |
A significant trend upwards in the process cumulative sum chart indicates ____________ |
A. | Shifting of mean in the positive direction |
B. | Shifting of mean in the negative direction |
C. | No shift in the process condition |
D. | No shift in the mean |
Answer» B. Shifting of mean in the negative direction | |
7. |
How are the changes in the conditions of the process, known using the Cusum charts? |
A. | By the change in Cusum value |
B. | By the change in the sample standard deviation |
C. | By plotting a s chart first |
D. | By plotting an R chart first |
Answer» B. By the change in the sample standard deviation | |
8. |
Cumulative control charts were first presented by ____________ |
A. | Shewhart |
B. | ASQC |
C. | ASQ |
D. | Page |
Answer» E. | |