MCQOPTIONS
Saved Bookmarks
This section includes 6 Mcqs, each offering curated multiple-choice questions to sharpen your Geotechnical Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
9.The permeameter assembly is placed in ____________ of the Jodhpur permeameter apparatus. |
A. | Bottom tank |
B. | Top of cylinder |
C. | Below the top plate |
D. | None of the mentioned |
Answer» B. Top of cylinder | |
2. |
The specimen in permeameter is compacted dynamically using___________ |
A. | DRT |
B. | Split collar |
C. | Rod temper |
D. | Core cutter |
Answer» D. Core cutter | |
3. |
If permeability at proctor s maximum dry density is required, which of the following method can be used? |
A. | Jodhpur mini compactor test |
B. | Proctor test |
C. | Compaction in permeameter |
D. | All of the mentioned |
Answer» E. | |
4. |
4.The Remoulded specimen in Jodhpur Permeameter, can be prepared by ___________ |
A. | Static compaction and Dynamic compaction |
B. | Tensile compaction |
C. | None of the mentioned |
D. | All of the mentioned |
Answer» B. Tensile compaction | |
5. |
The Jodhpur permeameter apparatus is, meant for studying _________ |
A. | Permeability characteristics |
B. | Coefficient of permeability |
C. | Capillary rise |
D. | All of the mentioned |
Answer» B. Coefficient of permeability | |
6. |
The Jodhpur permeameter, was designed by ___________ |
A. | Louden |
B. | Kozney |
C. | Alam Singh |
D. | Poiseullie s |
Answer» D. Poiseullie s | |