MCQOPTIONS
Saved Bookmarks
This section includes 2 Mcqs, each offering curated multiple-choice questions to sharpen your Basic Civil Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
What does M1 indicate in the formula: % water absorption = M2 M1 M2 x 100 |
| A. | Oven dried mass of brick |
| B. | Oven dried and cooled mass of brick |
| C. | Mass of water absorbed brick |
| D. | Mass of water absorbed and dried brick |
| Answer» C. Mass of water absorbed brick | |
| 2. |
Creep test is carried out in accordance with: |
| A. | IS 1528 |
| B. | IS 5688 |
| C. | IS 3495 |
| D. | IS 4568 |
| Answer» B. IS 5688 | |