MCQOPTIONS
Saved Bookmarks
This section includes 12 Mcqs, each offering curated multiple-choice questions to sharpen your Junit knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
_______________ is a document that contains the steps that has to be executed. |
| A. | Test Scenarios |
| B. | Test Cases |
| C. | Test Script |
| D. | Latent defect |
| Answer» C. Test Script | |
| 2. |
_____________ is written in a programming language and is a short program used to test part of functionality of the software system. |
| A. | Test Scenarios |
| B. | Test Cases |
| C. | Test Script |
| D. | Latent defect |
| Answer» D. Latent defect | |
| 3. |
______________ requires that only the first and second conditions of the RIP model are satisfied. |
| A. | Weak mutation testing |
| B. | Strong mutation testing |
| C. | Weak test data |
| D. | Strong test data |
| Answer» B. Strong mutation testing | |
| 4. |
During ___________ testing, code is not executed. |
| A. | Unit |
| B. | Dynamic |
| C. | Static |
| D. | Equivalence |
| Answer» D. Equivalence | |
| 5. |
Static testing is done using the software __________ |
| A. | Documentation |
| B. | Manual |
| C. | Design |
| D. | Comment |
| Answer» B. Manual | |
| 6. |
_________________ is prepared before the actual testing starts. |
| A. | Test Scenarios |
| B. | Test Cases |
| C. | Test Script |
| D. | Latent defect |
| Answer» B. Test Cases | |
| 7. |
STLC stands for ______________ |
| A. | Software Test Locale Code |
| B. | Software Transfer Limited Code |
| C. | Software Total Licence Control |
| D. | Software Test Life Cycle |
| Answer» E. | |
| 8. |
Which is likely to benefit most from the use of test tools providing test capture and replay facilities? |
| A. | Regression testing |
| B. | Integration testing |
| C. | System testing |
| D. | User acceptance testing |
| Answer» B. Integration testing | |
| 9. |
For the following codeif (a or b) and c thenThe condition/decision criteria will be satisfied by: |
| A. | a=true, b=true, c=true and a=false, b=false, c=false |
| B. | a=false, b=true, c=true |
| C. | a=true, b=false, c=true |
| D. | a=true, b=true, c=false |
| Answer» B. a=false, b=true, c=true | |
| 10. |
______________ is a method of achieving complete branch coverage without achieving complete path coverage. |
| A. | Basis Path Testing |
| B. | Loss Testing |
| C. | Universal Testing |
| D. | Random Testing |
| Answer» B. Loss Testing | |
| 11. |
________________ criteria checks whether each state in a finite-state machine been reached and explored. |
| A. | Path coverage |
| B. | Loop coverage |
| C. | Entry/exit coverage |
| D. | State coverage |
| Answer» E. | |
| 12. |
PVC stands for _____________ |
| A. | Parameter Value Condition |
| B. | Parameterised Values Check |
| C. | Parameter Value Coverage |
| D. | Path Value Check |
| Answer» D. Path Value Check | |