Explore topic-wise MCQs in Petroleum Production Operations.

This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.

1.

How can we ensure efficient placement of a cement sheath around the casing string?

A. By using Reamer
B. By using centralizer
C. By using casing shoe
D. By using agitator
Answer» C. By using casing shoe
2.

What is the actual intention of pumping CO2 into the reservoir in the oil and gas industry?

A. To increase pressure to increase production
B. To decrease the production
C. To kill the reservoir
D. To expand the reservoir
Answer» B. To decrease the production
3.

What is not an advantage of using coil tubing?

A. Smaller crew
B. Better kick detection
C. Can circulate large volumes of drilling fluid
D. No drill string connection
Answer» D. No drill string connection
4.

Why Squeeze cementing is used?

A. Seal thief or lost-circulation zones
B. To start the production
C. To increase the mud density
D. To increase the drilling fluid density
Answer» B. To start the production
5.

What is Squeeze cementing?

A. It is the process of injecting or squeezing drilling mud into a problematic void space at a desired location in the well
B. It is the process of removing the cement from a problematic void space at a desired location in the well
C. It is the process of injecting or squeezing formation fluid into a problematic void space at a desired location in the well
D. It is the process of injecting or squeezing cement into a problematic void space at a desired location in the well
Answer» E.