1. |
How can we ensure efficient placement of a cement sheath around the casing string? |
A. | By using Reamer |
B. | By using centralizer |
C. | By using casing shoe |
D. | By using agitator |
Answer» C. By using casing shoe | |
2. |
What is the actual intention of pumping CO2 into the reservoir in the oil and gas industry? |
A. | To increase pressure to increase production |
B. | To decrease the production |
C. | To kill the reservoir |
D. | To expand the reservoir |
Answer» B. To decrease the production | |
3. |
What is not an advantage of using coil tubing? |
A. | Smaller crew |
B. | Better kick detection |
C. | Can circulate large volumes of drilling fluid |
D. | No drill string connection |
Answer» D. No drill string connection | |
4. |
Why Squeeze cementing is used? |
A. | Seal thief or lost-circulation zones |
B. | To start the production |
C. | To increase the mud density |
D. | To increase the drilling fluid density |
Answer» B. To start the production | |
5. |
What is Squeeze cementing? |
A. | It is the process of injecting or squeezing drilling mud into a problematic void space at a desired location in the well |
B. | It is the process of removing the cement from a problematic void space at a desired location in the well |
C. | It is the process of injecting or squeezing formation fluid into a problematic void space at a desired location in the well |
D. | It is the process of injecting or squeezing cement into a problematic void space at a desired location in the well |
Answer» E. | |