MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
How can we ensure efficient placement of a cement sheath around the casing string? |
| A. | By using Reamer |
| B. | By using centralizer |
| C. | By using casing shoe |
| D. | By using agitator |
| Answer» C. By using casing shoe | |
| 2. |
What is the actual intention of pumping CO2 into the reservoir in the oil and gas industry? |
| A. | To increase pressure to increase production |
| B. | To decrease the production |
| C. | To kill the reservoir |
| D. | To expand the reservoir |
| Answer» B. To decrease the production | |
| 3. |
What is not an advantage of using coil tubing? |
| A. | Smaller crew |
| B. | Better kick detection |
| C. | Can circulate large volumes of drilling fluid |
| D. | No drill string connection |
| Answer» D. No drill string connection | |
| 4. |
Why Squeeze cementing is used? |
| A. | Seal thief or lost-circulation zones |
| B. | To start the production |
| C. | To increase the mud density |
| D. | To increase the drilling fluid density |
| Answer» B. To start the production | |
| 5. |
What is Squeeze cementing? |
| A. | It is the process of injecting or squeezing drilling mud into a problematic void space at a desired location in the well |
| B. | It is the process of removing the cement from a problematic void space at a desired location in the well |
| C. | It is the process of injecting or squeezing formation fluid into a problematic void space at a desired location in the well |
| D. | It is the process of injecting or squeezing cement into a problematic void space at a desired location in the well |
| Answer» E. | |