

MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
1. |
What is wait on cement? |
A. | The time required for cementing |
B. | The time required for casing placement |
C. | The time required for the cement to solidify |
D. | The time required for the cement to just place around the casing |
Answer» C. The time required for the cement to solidify | |
2. |
The Cement Retainer is a drillable packer. |
A. | True |
B. | False |
Answer» B. False | |
3. |
Why does coiled tubing have a faster rate of penetration than rotary drilling rig? |
A. | It doesn’t need a special crew |
B. | Since connection needs to be made |
C. | It is a continuous reel |
D. | It requires more joined pipes to connect with |
Answer» D. It requires more joined pipes to connect with | |
4. |
When is the retrievable squeeze packers used? |
A. | Resetting permits flexibility and to find casing leak |
B. | Low-pressure application |
C. | High-pressure application |
D. | At the time of Drilling |
Answer» B. Low-pressure application | |
5. |
Squeeze packers are used for low-pressure squeeze cementing. |
A. | True |
B. | False |
Answer» C. | |