MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
What is the most common use of Coiled tubing? |
| A. | Cement jobs |
| B. | Intervention and completion |
| C. | Running casing |
| D. | Fracturing |
| Answer» C. Running casing | |
| 2. |
In which of the following case workover rig or mobile rig is not used? |
| A. | Drilling |
| B. | Pulling tubing |
| C. | CO<sub>2</sub> flooding |
| D. | Cement jobs |
| Answer» D. Cement jobs | |
| 3. |
Slickline has no electrical conductor. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 4. |
What can snubbing do, that Coil Tubing can t? |
| A. | Faster drilling |
| B. | Rotate |
| C. | Faster production |
| D. | Packer disintegration |
| Answer» C. Faster production | |
| 5. |
Which of the following is used to push the cement down the well? |
| A. | Packer |
| B. | Top Drive |
| C. | Plug |
| D. | Coiled tubing |
| Answer» D. Coiled tubing | |