| 51. |
Name an evaluation technique to assess the quality of test cases ? |
| A. | Mutation analysis |
| B. | Validation |
| C. | Verification |
| D. | Performance analysis |
| Answer» B. Validation | |
| 52. |
________________ methods can be used to drive validations tests ? |
| A. | Yellow-box testing |
| B. | Black-box testing |
| C. | White-box testing |
| D. | All of the mentioned |
| Answer» C. White-box testing | |
| 53. |
Many applications using static analysis find 0.1-0.2% NCSS. NCSS stands for______________________? |
| A. | Non-Code Source Statement |
| B. | Non Comment Source Sentence |
| C. | Non-Comment Source Statement |
| D. | All of the mentioned |
| Answer» D. All of the mentioned | |
| 54. |
Maintenance testing is performed using which methodology ? |
| A. | Retesting |
| B. | Sanity testing |
| C. | Breadth test and depth test |
| D. | Confirmation testing |
| Answer» D. Confirmation testing | |
| 55. |
Lower and upper limits are present in which chart ? |
| A. | Run chart |
| B. | Bar chart |
| C. | Control chart |
| D. | None of the mentioned |
| Answer» B. Bar chart | |
| 56. |
ITG stands for___________________? |
| A. | instantaneous test group |
| B. | integration testing group |
| C. | individual testing group |
| D. | independent test group |
| Answer» E. | |
| 57. |
Inspections and testing are what kinds of Quality Costs ? |
| A. | Prevention |
| B. | Internal Failure |
| C. | External Failure |
| D. | Appraisal |
| Answer» E. | |
| 58. |
In which testing level the focus is on customer usage ? |
| A. | Alpha Testing |
| B. | Beta Testing |
| C. | Validation Testing |
| D. | Both Alpha and Beta |
| Answer» E. | |
| 59. |
In which of the following testing strategies, a smallest testable unit is the encapsulated class or object ? |
| A. | Unit testing |
| B. | Integration testing |
| C. | System testing |
| D. | None of the mentioned |
| Answer» B. Integration testing | |
| 60. |
How are baselines verified ? |
| A. | By reviews |
| B. | By inspections |
| C. | By testing of code |
| D. | All of the mentioned |
| Answer» D. All of the mentioned | |
| 61. |
Exhaustive testing is___________________? |
| A. | always possible |
| B. | practically possible |
| C. | impractical but possible |
| D. | impractical and impossible |
| Answer» D. impractical and impossible | |
| 62. |
Execution Verifier is a dynamic tool that is also known as_____________________? |
| A. | Test File Generator |
| B. | Coverage Analyzer |
| C. | Output Comparator |
| D. | Test Harness System |
| Answer» C. Output Comparator | |
| 63. |
Effective testing will reduce __________________ cost? |
| A. | maintenance |
| B. | design |
| C. | coding |
| D. | documentation |
| Answer» B. design | |
| 64. |
Debugging Program is a program which runs concurrently with the program under test & provide commands to_____________________? |
| A. | examine memory & registers |
| B. | stop execution at a particular point |
| C. | search for references for particular variables, constant and registers |
| D. | all of the mentioned |
| Answer» E. | |
| 65. |
Cyclomatic Complexity method comes under which testing method ? |
| A. | Yellow box |
| B. | White box |
| C. | Gray box |
| D. | Black box |
| Answer» C. Gray box | |
| 66. |
CCB stands for__________________? |
| A. | Change Control Board |
| B. | Change Control Baseline |
| C. | Cumulative Changes in Baseline |
| D. | None of the mentioned |
| Answer» B. Change Control Baseline | |
| 67. |
_______________ categorizes class operations based on the generic function that each performs? |
| A. | Category-based partitioning |
| B. | Attribute-based partitioning |
| C. | State-based partitioning |
| D. | None of the mentioned |
| Answer» B. Attribute-based partitioning | |
| 68. |
By collecting __________________ during software testing, it is possible to develop meaningful guidelines to halt the testing process? |
| A. | Failure intensity |
| B. | Testing time |
| C. | Metrics |
| D. | All of the mentioned |
| Answer» D. All of the mentioned | |
| 69. |
Boundary value analysis belong to ? |
| A. | White Box Testing |
| B. | Black Box Testing |
| C. | White Box & Black Box Testing |
| D. | None of the mentioned |
| Answer» C. White Box & Black Box Testing | |
| 70. |
Beta Testing is done by____________________? |
| A. | Developers |
| B. | Testers |
| C. | Users |
| D. | All of the mentioned |
| Answer» D. All of the mentioned | |
| 71. |
Beta testing is done at_________________? |
| A. | User’s end |
| B. | Developer’s end |
| C. | User’s & Developer’s end |
| D. | None of the mentioned |
| Answer» B. Developer’s end | |
| 72. |
Behavioral testing is__________________? |
| A. | White box testing |
| B. | Black box testing |
| C. | Grey box testing |
| D. | None of the mentioned |
| Answer» C. Grey box testing | |
| 73. |
Alpha testing is done at________________? |
| A. | Developer’s end |
| B. | User’s end |
| C. | Developer’s & User’s end |
| D. | None of the mentioned |
| Answer» B. User’s end | |
| 74. |
According to Pareto’s principle, x% of defects can be traced to y% of all causes. What are the values of x and y ? |
| A. | 60, 40 |
| B. | 70, 30 |
| C. | 80, 20 |
| D. | No such principle exists |
| Answer» D. No such principle exists | |
| 75. |
According to ISO 9001, inspection and testing comes under which management responsibility ? |
| A. | Process control |
| B. | Document control |
| C. | Control of nonconforming products |
| D. | Servicing |
| Answer» B. Document control | |
| 76. |
Acceptance testing is also known as____________________? |
| A. | Grey box testing |
| B. | White box testing |
| C. | Alpha Testing |
| D. | Beta testing |
| Answer» E. | |