This section includes 26 Mcqs, each offering curated multiple-choice questions to sharpen your Software Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
Which of the following is the task of project indicators ? |
| A. | help in assessment of status of ongoing project |
| B. | track potential risk |
| C. | help in assessment of status of ongoing project & track potential risk |
| D. | none of the mentioned |
| Answer» D. none of the mentioned | |
| 2. |
Which of the following is not categorized under Component-Level Design Metrics ? |
| A. | Complexity Metrics |
| B. | Cohesion Metrics |
| C. | Morphology Metrics |
| D. | Coupling Metrics |
| Answer» D. Coupling Metrics | |
| 3. |
Which of the following is not categorized under Product Operation of McCall’s Software Quality Factors ? |
| A. | Flexibility |
| B. | Reliability |
| C. | Usability |
| D. | Integrity |
| Answer» B. Reliability | |
| 4. |
Which of the following is not a metric for design model ? |
| A. | Interface design metrics |
| B. | Component-level metrics |
| C. | Architectural metrics |
| D. | Complexity metrics |
| Answer» E. | |
| 5. |
Which of the following is not a direct measure of SE process ? |
| A. | Efficiency |
| B. | Cost |
| C. | Effort Applied |
| D. | All of the mentioned |
| Answer» B. Cost | |
| 6. |
Which of the following is an indirect measure of product ? |
| A. | Quality |
| B. | Complexity |
| C. | Reliability |
| D. | All of the Mentioned |
| Answer» E. | |
| 7. |
Which of the following does not affect the software quality and organizational performance ? |
| A. | Market |
| B. | Product |
| C. | Technology |
| D. | People |
| Answer» B. Product | |
| 8. |
Usability in metric analysis is defined as the degree to which the software_________________? |
| A. | stated needs |
| B. | is easy to use |
| C. | makes optimal use of system resources |
| D. | none of the mentioned |
| Answer» C. makes optimal use of system resources | |
| 9. |
Usability can be measured in terms of_________________? |
| A. | Intellectual skill to learn the system |
| B. | Time required to become moderately efficient in system usage |
| C. | Net increase in productivity |
| D. | All of the mentioned |
| Answer» E. | |
| 10. |
The intent of project metrics is_____________________? |
| A. | minimization of development schedule |
| B. | for strategic purposes |
| C. | assessing project quality on ongoing basis |
| D. | minimization of development schedule and assessing project quality on ongoing basis |
| Answer» E. | |
| 11. |
The arc-to-node ratio is given as r = a/n. What does ‘a’ represent in the ratio ? |
| A. | maximum number of nodes at any level |
| B. | longest path from the root to a leaf |
| C. | number of modules |
| D. | lines of control |
| Answer» E. | |
| 12. |
The amount of time that the software is available for use is known as_________________? |
| A. | Reliability |
| B. | Usability |
| C. | Efficiency |
| D. | Functionality |
| Answer» B. Usability | |
| 13. |
Percentage of modules that were inspected is a part of__________________? |
| A. | Product Metrics |
| B. | Process Metrics |
| C. | Project Metrics |
| D. | All of the mentioned |
| Answer» C. Project Metrics | |
| 14. |
Number of errors found per person hours expended is an example of a____________________? |
| A. | measurement |
| B. | measure |
| C. | metric |
| D. | all of the mentioned |
| Answer» D. all of the mentioned | |
| 15. |
Number of dynamic web pages provides an idea about____________ for a web page that is to be built? |
| A. | size |
| B. | complexity |
| C. | effort |
| D. | all of the mentioned |
| Answer» E. | |
| 16. |
MTTC falls the the category of____________________? |
| A. | correctness |
| B. | integrity |
| C. | maintainability |
| D. | all of the mentioned |
| Answer» D. all of the mentioned | |
| 17. |
Link based measures rely on _____________ structure of a web graph to obtain related pages? |
| A. | Embedded |
| B. | Hyperlink |
| C. | Dynamic |
| D. | All of the mentioned |
| Answer» C. Dynamic | |
| 18. |
In size oriented metrics, metrics are developed based on the _____________________? |
| A. | number of Functions |
| B. | number of user inputs |
| C. | number of lines of code |
| D. | amount of memory usage |
| Answer» D. amount of memory usage | |
| 19. |
Identify the correct option with reference to Software Quality Metrics ? |
| A. | Integrity = [Sigma(1 – threat)] * (1 – security) |
| B. | Integrity = [1 – Sigma(threat)] * (1 – security) |
| C. | Integrity = [1 – threat * Sigma(1 – security)] |
| D. | Integrity = Sigma[1 – threat * (1 – security)] |
| Answer» E. | |
| 20. |
How many Information Domain Values are used for Function Point Computation ? |
| A. | three |
| B. | four |
| C. | five |
| D. | six |
| Answer» D. six | |
| 21. |
Function Points in software engineering was first proposed by_______________? |
| A. | Booch |
| B. | Boehm |
| C. | Albrecht |
| D. | Jacobson |
| Answer» D. Jacobson | |
| 22. |
Function Point Computation is given by the formula___________________? |
| A. | FP = [count total * 0.65] + 0.01 * sum(Fi) |
| B. | FP = count total * [0.65 + 0.01 * sum(Fi)]. |
| C. | FP = count total * [0.65 + 0.01] * sum(Fi) |
| D. | FP = [count total * 0.65 + 0.01] * sum(Fi) |
| Answer» C. FP = count total * [0.65 + 0.01] * sum(Fi) | |
| 23. |
Defects removal efficiency (DRE)depends on ______________________? |
| A. | E – errors found before software delivery |
| B. | D – defects found after delivery to user |
| C. | Both E and D |
| D. | Varies with project |
| Answer» D. Varies with project | |
| 24. |
Cost and schedule are a part of_________________________? |
| A. | Product Metrics |
| B. | Process Metrics |
| C. | Project Metrics |
| D. | All of the mentioned |
| Answer» D. All of the mentioned | |
| 25. |
Architectural Design Metrics are ______________ in nature ? |
| A. | Black Box |
| B. | White Box |
| C. | Gray Box |
| D. | Green Box |
| Answer» B. White Box | |
| 26. |
A graphical technique for finding if changes and variation in metrics data are meaningful is known as_________________? |
| A. | DRE (Defect Removal Efficiency) |
| B. | Function points analysis |
| C. | Control Chart |
| D. | All of the mentioned |
| Answer» D. All of the mentioned | |