Explore topic-wise MCQs in Software Engineering Mcqs.

This section includes 82 Mcqs, each offering curated multiple-choice questions to sharpen your Software Engineering Mcqs knowledge and support exam preparation. Choose a topic below to get started.

1.

Degree to which design specifications are followed in manufacturing the product is called_________________?

A. Quality Control
B. Quality of conformance
C. Quality Assurance
D. None of the mentioned
Answer» C. Quality Assurance
2.

Which regression test selection technique exposes faults caused by modifications ?

A. Efficiency
B. Precision
C. Generality
D. Inclusiveness
Answer» E.
3.

Who identifies, documents, and verifies that corrections have been made to the software ?

A. Project manager
B. Project team
C. SQA group
D. All of the mentioned
Answer» D. All of the mentioned
4.

What type of software testing is generally used in Software Maintenance ?

A. Regression Testing
B. System Testing
C. Integration Testing
D. Unit Testing
Answer» B. System Testing
5.

Which selective retest technique selects every test case that causes a modified program to produce a different output than its original version?

A. Coverage
B. Minimization
C. Safe
D. Maximization
Answer» D. Maximization
6.

CMM stands for_____________________?

A. Capability Management Module
B. Conservative Maturity Model
C. Capability Maturity Module
D. Capability Maturity Model
Answer» E.
7.

Regression testing is a very expensive activity?

A. True
B. False
Answer» B. False
8.

Which of the following is not included in External failure costs ?

A. testing
B. help line support
C. warranty work
D. complaint resolution
Answer» B. help line support
9.

CO policy in CMM means___________________?

A. The leadership practices in Commitment to Perform
B. The organizational structure (groups) practices in Ability to Perform
C. The policy practices in Commitment to Perform
D. The planning practices in Commitment to Perform
Answer» D. The planning practices in Commitment to Perform
10.

Which of the following is not included in failure costs ?

A. rework
B. repair
C. failure mode analysis
D. none of the mentioned
Answer» E.
11.

Which requirements are the foundation from which quality is measured ?

A. Hardware
B. Software
C. Programmers
D. None of the mentioned
Answer» C. Programmers
12.

The Capability Maturity Model (CMM) is a continuous model ?

A. True
B. False
Answer» C.
13.

Which of the following is not a SQA plan for a project ?

A. evaluations to be performed
B. amount of technical work
C. audits and reviews to be performed
D. documents to be produced by the SQA group
Answer» C. audits and reviews to be performed
14.

The ISO 9000 series of standards is a program that can be used for external quality assurance purposes ?

A. True
B. False
Answer» C.
15.

What is not included in prevention costs ?

A. quality planning
B. formal technical reviews
C. test equipment
D. equipment calibration and maintenance
Answer» E.
16.

The primary objective of formal technical reviews is to find _________________ during the process so that they do not become defects after release of the software?

A. errors
B. equivalent faults
C. failure cause
D. none of the mentioned
Answer» B. equivalent faults
17.

Which of the following is not an appraisal cost in SQA ?

A. inter-process inspection
B. maintenance
C. quality planning
D. testing
Answer» D. testing
18.

Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?

A. CMM
B. ISO 9001
C. ISO 9000-3
D. None of the mentioned
Answer» D. None of the mentioned
19.

The CMMI assessment is based on a x-point scale. What is the value of x ?

A. 0
B. 2
C. 4
D. 6
Answer» E.
20.

____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?

A. ISO 9001
B. ISO 9000-4
C. CMM
D. All of the mentioned
Answer» B. ISO 9000-4
21.

Which of the following is not a maturity level in CMM ?

A. Design
B. Repeatable
C. Managed
D. Optimizing
Answer» D. Optimizing
22.

It is always best to start process analysis with a new test model ?

A. True
B. False
Answer» C.
23.

Which of the following is not a part of process change ?

A. Introducing new practices, methods or processes
B. Introducing new team members to existing project
C. Introducing or removing deliverable
D. Introducing new roles or responsibilities
Answer» C. Introducing or removing deliverable
24.

Processes for evolving a software product depend on __________________?

A. Type of software to be maintained
B. Development processes used
C. Skills and experience of the people involved
D. All of the mentioned
Answer» E.
25.

Process improvement is the set of activities, methods, and transformations that developers use to develop and maintain information systems ?

A. True
B. False
Answer» C.
26.

How many stages are there in process improvement ?

A. three
B. four
C. five
D. six
Answer» B. four
27.

What is a tangible output of an activity that is predicted in a project plan ?

A. Deliverable
B. Activity
C. Condition
D. Process
Answer» B. Activity
28.

In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?

A. Software Product Engineering
B. Software Quality Assurance
C. Software Subcontract Management
D. Software Quality Management
Answer» B. Software Quality Assurance
29.

ISO 9001 is not concerned with _______________ of quality records?

A. collection
B. maintenance
C. verification
D. dis-positioning
Answer» D. dis-positioning
30.

The cost of re-engineering is often significantly less than the costs of developing new software ?

A. True
B. False
Answer» B. False
31.

According to ISO 9001, the causes of nonconforming product should be____________________?

A. deleted
B. eliminated
C. identified
D. eliminated and identified
Answer» E.
32.

The CMM emphasizes____________________?

A. continuous process improvement
B. the need to record information
C. the need to accept quality system
D. none of the mentioned
Answer» C. the need to accept quality system
33.

Reverse engineering is the last activity in a re-engineering project _____________________?

A. True
B. False
Answer» C.
34.

The Incremental Model is combination of elements of_____________________?

A. Build & FIX Model & Waterfall Model
B. Linear Model & RAD Model
C. Linear Model & Prototyping Model
D. Waterfall Model & RAD Model
Answer» D. Waterfall Model & RAD Model
35.

How many levels, does the DO-178B certification targeted by RTCADO-178B has ?

A. two
B. three
C. four
D. five
Answer» E.
36.

Model preferred to create client/server applications is _______________________?

A. WINWIN Spiral Model
B. Spiral Model
C. Concurrent Model
D. Incremental Model
Answer» D. Incremental Model
37.

Maintenance is classified into how many categories ?

A. two
B. three
C. four
D. five
Answer» D. five
38.

Human and organizational factors such as organizational structure and politics have a significant effect on the operation of sociotechnical systems ?

A. True
B. False
Answer» B. False
39.

What are the two ways to view the human error of a sociotechnical system ?

A. hardware and software approach
B. management and users approach
C. person and systems approach
D. all of the mentioned
Answer» D. all of the mentioned
40.

Spiral model was developed by ___________________?

A. Victor Bisili
B. Berry Boehm
C. Bev Littlewood
D. Roger Pressman
Answer» C. Bev Littlewood
41.

Which property of a sociotechnical system varies depending on how the component assemblies are arranged and connected ?

A. security
B. security
C. volume
D. reliability
Answer» D. reliability
42.

How many phases are there in Taute Maintenance Model ?

A. six
B. seven
C. eight
D. nine
Answer» D. nine
43.

There are _______________ overlapping stages in the lifetime of large and complex sociotechnical systems?

A. two
B. three
C. four
D. five
Answer» C. four
44.

In a sociotechnical system, you need to consider reliability from perspectives namely ?

A. only software reliability
B. only hardware reliability
C. hardware and software reliability
D. hardware, software and operator reliability
Answer» E.
45.

Which property of a sociotechnical system depends on the technical system components, its operators, and its operating environment ?

A. security
B. usability
C. volume
D. reliability
Answer» C. volume
46.

Sociotechnical systems are deterministic ?

A. True
B. False
Answer» C.
47.

CSTE stands for ____________________?

A. Certified Software Technology
B. Certified Software Tester
C. Certified Software Trainee
D. None of the mentioned
Answer» C. Certified Software Trainee
48.

Consider an example of a system which has a police command and control system that may include a geographical information system to provide details of the location of incidents. What kind of system the example represents ?

A. Complex System
B. Technical computer-based system
C. Sociotechnical System
D. Both Complex and Sociotechnical System
Answer» E.
49.

The process of transforming a model into source code is known as___________________?

A. Forward engineering
B. Reverse engineering
C. Re-engineering
D. Reconstructing
Answer» B. Reverse engineering
50.

Which technique is applied to ensure the continued evolution of legacy systems ?

A. Forward engineering
B. Reverse Engineering
C. Reengineering
D. Reverse Engineering and Reengineering
Answer» E.